Close Menu
    Muscat JournalMuscat Journal
    • Home
    • Contact Us
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Muscat JournalMuscat Journal
    Home » ADNOC Drilling awarded $2 billion for the Hail, Ghasha Development Project
    Business

    ADNOC Drilling awarded $2 billion for the Hail, Ghasha Development Project

    July 27, 2022
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    In connection with the Hail and Ghasha Development Project, Abu Dhabi National Oil Company (ADNOC) announced the award of two large contracts totaling $2 billion (AED7.49 billion) to ADNOC Drilling. A total of $1.3 billion (AED4.89 billion) will be spent on integrated drilling services and fluids, and $711 million (AED2.6 billion) will be spent on providing four Island Drilling Units. ADNOC Logistics & Services was also awarded a third contract for offshore logistics and marine support services valued at $681 million (AED2.5 billion).

    ADNOC Drilling awarded $2 billion for the Hail, Ghasha Development ProjectIn total, more than 80% of the awards will flow back into the UAE’s economy as part of ADNOC’s successful In-Country Value (ICV) program. Each of the three contracts covers the Hail and Ghasha drilling campaign for a maximum of ten years. This project is part of the Ghasha Concession, which is the world’s largest offshore sour gas development and an important component of ADNOC’s integrated gas masterplan as well as an important enabler of UAE gas self-sufficiency.

    With the expansion of ADNOC’s liquified natural gas (LNG) capacity, ADNOC’s gas masterplan ensures a sustainable and economical supply of natural gas to meet the growing demands of the UAE and international markets. As part of the plan, new approaches and technologies will be applied to increase and improve gas recovery from existing fields, as well as develop untapped resources and leverage innovation to reduce emissions over time.

    Natural gas production from the Ghasha Concession is expected to begin around 2025, ramping up to over 1.5 billion standard cubic feet per day (SCFD) by the end of the decade. A total of four artificial islands have already been completed, and development drilling is underway. As part of the Ghasha Concession, ADNOC and its partners awarded two Engineering, Procurement & Construction (EPC) contracts last November. For the Hail and Ghasha project, they also awarded a contract for updating Front-End Engineering and Design (FEED). By the end of the year, the updated design will further optimize costs and timing, as well as potentially accelerate carbon capture integration.

    Related Posts

    EU expands IRIS2 satellite network to 348 spacecraft in new deal

    August 8, 2026

    Brent and WTI extend losses after sharp crude market selloff

    August 5, 2026

    OECD inflation falls to 4.2% and energy price pressures cool

    August 5, 2026

    UK solar hits 22.8 GW ahead of plug-in solar rollout

    August 3, 2026

    Oil prices surge past $90 then retreat on market shifts

    August 3, 2026

    Australia passes major National Disability Insurance Scheme reform

    August 1, 2026
    Latest News

    EU expands IRIS2 satellite network to 348 spacecraft in new deal

    August 8, 2026

    BRUSSELS / RankWire.AI / – The European Commission finalized a major expansion of the European…

    Magnitude 4.9 earthquake hits southwestern China causing one death

    August 8, 2026

    Obesity linked to 8.2% of Belgium deaths national study shows

    August 8, 2026

    China adds drone curbs and restrictions on US entities

    August 6, 2026

    New Ebola vaccine enters human trial as Congo cases rise

    August 5, 2026

    Brent and WTI extend losses after sharp crude market selloff

    August 5, 2026

    Fuego volcano eruption puts Guatemala regions on red alert

    August 5, 2026

    OECD inflation falls to 4.2% and energy price pressures cool

    August 5, 2026
    © 2026 Muscat Journal | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.